The Construction Tips
Hi there, welcome.
Marking of the Site
The marking of the site needs to be taken from the benchmark, i.e. from the site boundary. The right angle at each of the corners and the diagonals need to be checked.
Marking in construction site |
Foam work/Shuttering
You see, Column shuttering is one of the important steps in construction, yet so many people ignore it. Before setting the foam works in the correct place, all inner layers of the shuttering should be coated with oil or other parting material. Then the foam work is placed in the required position after the column shoe has been cast. After this, the levels of the column box alignment, along with the vertical alignment, will ensure that the column we are going to cast will be in perfect shape.
![]() |
Circular Foam Work |
Comments
Post a Comment